Disha Cabbage
-
Disha Cabbage by Seminis, a reliable hybrid producing bluish-green, round, compact heads.
-
Average head weight: 1.0–1.5 kg, ideal for fresh market and transport.
-
Strong internal structure with excellent field holding of 20–25 days.
-
Early maturing variety, ready for harvest in 60–65 days.
-
Suitable for well-drained medium to sandy loam soils and adaptable to regional sowing seasons.
-
Recommended spacing: 45×30 cm (early) or 60×45 cm (late) with seed rate of 180–200 g/acre (early) and 120–150 g/acre (late).
₹350.00 Original price was: ₹350.00.₹250.00Current price is: ₹250.00.
Payment Methods:
Description
Product Name DISHA CABBAGE
Brand Seminis
Crop Type Vegetable
Crop Name Cabbage Seeds
Product Description
Specification :
Disha
Head Colour : Bluish Green
Head Weight : 1.0 to 1.5 kg
Head Shape : Round
Field Holding : 20 to 25 days
Internal Structure : Good
Maturity : 60 to 65 days
Tips for Growing Cabbage
Soil
: Well drained medium loam and /or sandy loam soils are suitable.
Sowing time
: As per the regional practices and timings.
Optimum temp.for germination
: 25 – 300C
Transplanting
: 25-30 days after sowing.
Spacing
: Early maturity – Row to Row : 45 cm, Plant to Plant : 30 cm
Late Maturity
– Row to Row : 60cm, Plant to Plant : 45 cm
Seed rate
: Early maturity : 180 – 200 gm / acre.
Late Maturity
: 120 -150 gm / acre
Preparation of Main field
: Deep ploughing and harrowing. ● Add well decomposed FYM 7-8 tones followed by harrowing to mix in the soil thoroughly. ● Open the ridges and furrows at required spacing. per acre Apply basal dose of chemical fertilizer before transplanting. ● irrigate the field one day before transplanting, make a hole at a required spacing to plant seedling . ● Transplanting should be done late afternoon, after transplanting light irrigation should be given for better and quick establishment.
Fertilizer Management :
* Basal application before transplanting : 25:50:60 NPK kg / acre
* First top dressing 10-15 days after transplanting : 25:50:60 NPK kg / acre
* Second application 20 – 25 days after first top dressing : 25:00:00 NPK kg / acre
* Third application 10-15 days after second application : 25:00:00 NPK kg / acre
* Boron & Molybdenum should be sprayed at button stage

Reviews
Clear filtersThere are no reviews yet.